buy vogue prada sneakers Heels men shop christian louboutin outlet store Cheap outlet replica louis vuitton belt wallet Replica online 2015 purse women louis vuitton christian louboutin online italia christian louboutin heels outlet Chaussures pas cheres louboutin soldes Replica sale kelly bags best hermes Real outlet replica prada women men Purse belt replica sale 2015 prada louis vuitton outlet 2015 sale hermes birkin 35cm tote bag gold shiny croco leather h6089 silver christian louboutin outlet replica cheap prada designer handbags celine replica hermes italia scarpe louboutin prezzo louis vuitton bags uk Replica store best hermes kelly bags yves saint laurent replica Men bags hermes shop replica sale Cheap Mulberry Bags Fake women wallet outlet online yves saint laurent yves saint laurent crossbody bags online hermes for sale mulberry handbags sale christian louboutin 34 menopause discount yves saint laurent Satchel yves saint laurent men replica celine replica hermes belt brown discount yves saint laurent wallet yves saint laurent handbags replica celine bags outlet Celine handbags paris cheap replica online celine handbags online christian louboutin heels zanotti bangkok tas hermes birkin jelly glitter hermes birkin bag 35 ghost whi celine bags boston louis vuitton belt quiet waters dog mulberry shop celine outlet louis vuitton sac prix goncourt 2008 discount yves saint laurent belt
Project Type
Education
San Diego, CA
Client
San Diego Unified School District
Cost
$3.427 million
Carson & Carver Elementary School Modernizations
Carson Elementary School
Repair and renovation work for Carson Elementary, located in Linda Vista, included construction of a library, elevator tower, and lunch court shelter, ADA upgrades to the existing student and staff restrooms and installation of directional and informational signage. Restoration of the existing auditorium to include the installation of a wheelchair lift at the stage area.
Carver Elementary School:
Repair and renovation work for Carver Elementary, located in the College area, included a new library, lunch court shelter and playground shade shelter, ADA upgrades to existing student and staff restrooms, new signage installation and an accessible lift for the existing auditorium stage. Site improvements include ADA improvements to the path of travel, repair of walks, a new ramp and fire hydrant work.