Prada bags men cheap outlet replica Authentic replica store heels sandals christian louboutin replica louis vuitton bags online fake yves saint laurent Satchel cheap chloe bag 2015 Replica store red bottoms shoes sneakers shop The best wallet women replica outlet prada Hermes cheap replica sale men kelly Cheap celine bags mini luggage replica online hermes belt kit 38mm yves saint laurent belt replica Hermes outlet sale men belt 2015 Wholesale replica store celine bags sunglasses Outlet replica shop yves saint laurent women totes bags Best birkin purse replica store hermes Outlet replica real louis vuitton purse men Hermes shop bags birkin outlet store Women satchel yves saint laurent outlet online official Louis vuitton handbags purse replica online official mulberry outlet Outlet store real women bags yves saint laurent Outlet sale official yves saint laurent women crossbody wallet Louis vuitton handbags belt replica online fake cheap yves saint laurent men yves saint laurent Clutch outlet mulberry online bags outlet hermes di jakarta yves saint laurent belt sale mulberry sac a main cheap yves saint laurent Satchel yves saint laurent Totes bags outlet celine outlet hermes belt size chart men hermes shop dubai airport celine bag outlet yves saint laurent bags replica sale christian louboutin 34 menopause hermes bags for less celine bags outlet red bottoms replica kentucky fried yves saint laurent wallet
Project Type
Public Infrastructure
Huntington Beach, CA
Client
Richard Brady & Associates for City of Huntington Beach
Cost
$10.6 million
Huntington Beach Water Utilities Yard Expansion and Upgrade
The City of Huntington Beach Public Works, Water/Wastewater Division serves the City of Huntington Beach in Orange County. The Utilities Division Operations Yard is located at 19001 Huntington Street and is the main operating center for the city=owned water and wastewater enterprise.
The RBA/PWA team prepared a Facilities Master Plan for the utilities operations yard, providing concept design and recommendations for enhancing operating efficiencies and effectiveness. The recommendations detail the design and construction of a new and remodeled facility meeting present and future staffing and operations needs. The team is proceeding with Construction Documents production for the project, providing:
Remodel and seismic upgrade of existing Operations/Administration Building
Construction of new Operations Building to provide for training, GIS, water quality, and expanded laboratory facilities
Construction of new Distribution and Meter Building to provide workshops for water distribution and metering, and wastewater operations
Construction of new storage facility addition to existing Production Building
Construction of new covered vehicle and fleet parking facilities
Associated site work including landscaping, site fencing, and relocation of existing miscellaneous support facilities.